Course: Risk Management
Length is 3 Page
No plagiarism
Due By: 10/13/14
BUYU Manufacturing has been contracted to provide SAEL Electronics with printed circuit and motherboards (PC) boards under the following terms:
BUYU manufactures the PC boards through a process called batching, and manufacturing costs are as follows:
BUYU must decide whether it should manufacture all 200,000 PC boards now, or if it should manufacture 100,000 now and the other 100,000 boards only if SAEL decides to buy them. If BUYU manufactures 200,000 now and SAEL does not exercise its option, then BUYU will lose the manufacturing cost of the extra 100,000 boards. BUYU believes that there is a 50% chance that SAEL will exercise its option to buy the additional 100,000 PC boards.
Grading Criteria |
|
20% |
Discuss the potential profit of manufacturing all 200,000 boards now. |
20% |
Draw a decision tree for the decision that BUYU faces. |
20% |
If BUYU uses its expected profit as the basis for its decision, determine the preferred course of action. |
20% |
Determine the range of values of the probability that SAEL will exercise its option making the decision found in part c as optimal, and determine the expected value of perfect information about whether SAEL will exercise its option. |
20% |
Assume now that BUYU is constantly risk averse with a risk tolerance of $100,000 and answer parts c and d again. |