Need two short lab assignments done today.
September 14, 2021
w4 IT department
September 14, 2021

Civil Engineering Project COST ESTIMATION & Project scheduling. Here is Attached A architectural design in AUTOCAD. Its Steel Garage Parking will use the welding connection and square footing for foundation. will be build in baltimore maryland use zip code 21251. Please for the cost estimation the details of everything is required. for the project scheduling if you did it in excel make sure transfer it after that to world file. Also make sure the highlight the critical path for the project and the duration for each task. check the AUTOCAD to know how much materialize needing to do the estimation. please include all of the references that you use.

 
"Looking for a Similar Assignment? Order now and Get 10% Discount! Use Code "Newclient"

Hi there! Click one of our representatives below and we will get back to you as soon as possible.

Chat with us on WhatsApp